Local LLM infrastructure calculator

Find the useful delta between watts, tokens, and dollars.

Model a local 70B-class host, choose how it is powered, and compare the trade-off between immediate compute value, lifecycle cost, and energy independence.

Infrastructure model

Balance compute, power, and capital.

Compare documented local LLM hardware profiles across grid, hybrid grid-tied solar, and dedicated off-grid solar. The model prioritises 70B-class inference and reports both upfront and lifecycle TPS per dollar.

01 Hardware profile
Selected profile Dual RTX 3090 value node

VRAM
70B speed
Peak load
Hardware
02 Power selection
03 Operating option

04 Planning assumptions
Overall CapEx

compute + power infrastructure.

Projected TPS

TPS / CapEx × 10k

Higher means more projected 70B throughput per upfront dollar.

3-year TCO

modeled grid energy over the selected lifecycle.

TPS / TCO × 10k

Lifecycle score including grid energy, but excluding maintenance and replacement.

Active energy intensity

Estimated watt-hours required to generate 1,000 tokens at sustained output.

Daily energy

Solar array

Battery bank

Inverter / supply

Grid energy / year

Grid OpEx / year

At , before demand charges or tariff escalation.

Power strategy Power CapEx Overall CapEx Annual grid OpEx 3-year TCO TPS / TCO × 10k
Standard grid
Hybrid grid-tied
Off-grid solar
Hardware advantages
    Hardware risks
      Power advantages
        Power risks

          Documented equal-budget benchmark

          Reinvesting power infrastructure into compute changes the winner.

          These presets reproduce the three strategy examples in calculationInformation.md. Load one to continue adjusting its assumptions above.

          Off-grid baseline 15 TPS
          Pool
          2x RTX 3090
          Upfront
          $25,750
          3-year TCO
          $25,750
          TPS / TCO × 10k
          5.82
          Hybrid balance 35 TPS
          Pool
          6x 3090 / 4 active
          Upfront
          $24,500
          3-year TCO
          $26,768
          TPS / TCO × 10k
          13.07
          Pure grid maximum 42 TPS
          Pool
          6x RTX 3090 farm
          Upfront
          $19,000
          3-year TCO
          $22,801
          TPS / TCO × 10k
          18.42

          Planning model only. Hardware speeds, component costs, solar yield, and battery autonomy are estimates transcribed from calculationInformation.md, not supplier quotes or guaranteed benchmarks. Validate the final electrical design with a qualified installer and benchmark the intended model, quantisation, context length, and serving stack before purchase. Generator backup, maintenance, finance cost, hardware replacement, cooling installation, demand charges, and tariff escalation are not included.